 |  | 
Previous. All pages. Next. 1. 2. Page 3. 4. 5. 6. 7. 8. 9
| July 07, 2009 |
Nevada Copper Closes US$2,000,000 Convertible Debenture |
| June 26, 2009 |
Nevada Copper Announces US$2,000,000 Convertible Debenture |
| April 28, 2009 |
Nevada Copper - Drills High Grade: 42 Meters (136 Ft) @ 3.2% Copper, 1 g/t Gold In The E-2 Deposit And 38 Meters (125 Ft) @ 3.2% Copper In The East Deposit |
| March 23, 2009 |
Nevada Copper - Intersects 225 Meters (739 Feet) of 0.62% Copper |
| February 25, 2009 |
Nevada Copper - Reports High-Grade Drill Results In The South Deposit: 48.5 Meters (159.0 Ft) @ 1.40% Copper |
| February 06, 2009 |
Nevada Copper - Drilling Expands The North Deposit With Significant Copper Intercepts |
| January 21, 2009 |
Nevada Copper - Intersects 90 Meters (294 Feet) of 1.03% Copper in the Open Pittable South Deposit |
| December 19, 2008 |
Nevada Copper Announces Results Of Annual And Special Meeting Of Shareholders |
| December 16, 2008 |
Nevada Copper - Drilling Results Continue to Expand The Open-Pit North Deposit |
| November 07, 2008 |
Nevada Copper - High Grade Copper-Gold Results From Pumpkin Hollow Continue |
Previous. All pages. Next. 1. 2. Page 3. 4. 5. 6. 7. 8. 9 |  |  | 

|  |  |